corresponding pipe duct valves.
    Cooling load calculations should be based on the parameters in the application of project profiles Hongye software to draw cooling load ; determine the pision of air conditioning systems and system solutions should be determined by the actual advantages and disadvantages of the various parameters of the commercial plaza air conditioning system ; select the cold source , is based on data obtained Hongye software to choose ; design and calculation of wind systems , planning and design of the drawings , and through hydraulic calculations to verify ; indoor air supply and air distribution in the form of selected using air fan coil system , a new way of fan coil air supply with a single set of new air system, separate supply room ; design of water systems , plumbing layout should take into account the layout of each room , and the water system and planning ; duct system insulation and plumbing system design should comply with pipe insulation and corrosion requirements .
    Detailed requirements are as follows : load calculation part: Hongye envelope HVAC load calculation software is not included in the new wind load , in order to avoid the calculation results with the actual value of the software to produce errors , and therefore need to be some correction to make office buildings cooling load range falls (80 ~ 120W / m²), winter heat load (40 ~ 100W / m²). New wind load should be calculated separately.
    Air system components: the number of square units through each room and 30m ³ / (h • person ) fresh air to determine the fresh air of each room , and through the [ 2 ] determine the segment of new air damper tube size. Determination of the exhaust pipe is also true. Also need to be installed in accordance with the relevant specifications corresponding damper .
   Water system components: the translation of each room by cooling water outlet pipe flow , estimate the corresponding pipe diameter, and identify the most unfavorable water cycle refrigeration cycle resistance calculations to determine the pump head .
   Partially furnished room : the combination of design experience for a reasonable arrangement , aimed to facilitate daily operations and machine  
maintenance.
Insulation , corrosion parts: determined in accordance with design specifications , its role is to avoid unnecessary loss of cold heat.
 目录
0 绪论    1
0.1 空调设计背景    1
0.2 空调系统的发展方向    1
0.3本次设计的方向    2
1 系统方案的选择确定    3
2 工程概况    7
2.1建筑概况    7
2.2室内设计参数    7
2.3室外设计参数    7
3 空调负荷计算    9
3.1围护结构瞬变冷负荷计算原理    9
3.1.1外墙和屋面瞬变传热引起的冷负荷    9
3.1.2室内建筑冷负荷    9
3.1.3外窗瞬变传热引起的冷负荷    10
3.1.4设备散热形成的冷负荷    10
3.1.5新风冷负荷    11
3.2商场围护结构冷负荷计算    12
3.3各房间送风方式的确定    12
3.4 商业楼新风量和新风负荷的确定    13
3.4.1新风负荷计算举例    13
4 风机盘管加新风系统选型计算    15
4.1风机盘管系统选型计算    15
4.2新风机组的选型    18
5 空调风系统    19
5.1空调房间气流组织    19
5.2风口的布置    19
5.2.1新风入口注意事项    19
5.2.2风道的布置和制作要求    19
上一篇:科技大厦地下建筑消防设计+CAD图纸
下一篇:华东气候条件的无缝线路改造设计

海南省三亚市某综合购物广场的空调系统设计

论文化广场设计【5065字】

论文化广场的设计【2775字】

节能环保技术茬某大型商...

现代商业建筑设计剖析【2209字】

浅谈网络营销下商业建筑...

中國的文化广场设计【2434字】

《醉青春》导演作品阐述

高校网球场馆运营管理初探【1805字】

浅谈新形势下妇产科护理...

多元化刑事简易程序构建探讨【9365字】

谷度酒庄消费者回访调查问卷表

中国古代秘书擅权的发展和恶变

浅谈传统人文精神茬大學...

拉力采集上位机软件开发任务书

国内外无刷直流电动机研究现状

辩护律师的作证义务和保...