In the overall layout of sewage treatment plant,we have been taking the plane and vertical arrangement's coordination into consideration.In the context of meeting the treatment scheme,the plane layout of plant mainly use the original topography,to achieve the target of layout reasonably and compact,in-outflow smoothly,land using economically.According to the living、leisure building,office area,afforestation area and etc,we have already made a comprehensive plan.Due to the heavy smell of sludge area,we put it in the low-lying and blow the summer prevailing wind direction.The construction costs of the sewage treatment plant are supposed to take the depreciation rate of main equipment,civil work costs,artificial cost, cost of pipeline and etc into account,and thus help us to make the overall economic efficiency analysis.

  In this project design,I have consulted a large number of relevant literature and made a reference to other sewage treatment plant's running experience.By a great deal of calculation and comparison,I have continuous made a modification and improvement in view of the deficiency in design,making the outflow water quality satisfy the standard.The whole process flows are in accord with the real concepts,and both inpidual structure's design and parameters selection are meet the standards.The in-outflow water pipes calculation are in the content,and water elevation calculation listed in the attached table.Through the design of many weeks,I have basically completed the tasks of project design.

Key words:Sewage treatment;A/A/O(anaerobic-anoxia-aerobic);Removal of nitrogen and phosphorus

目  录

1 绪论 1

1.1 课题目的与意义 1

1.2 设计任务及资料 1

1.2.1 设计课题 1

1.2.2 设计资料 1

1.2.3 设计任务 2

2 污水处理厂工艺流程的确定 3

2.1 设计概况 3

2.2 处理程度 3

2.3 工艺流程选定 3

2.3.1 工艺流程对比 3

2.3.2 工艺设计原则 6

3 单元构筑物的设计与计算 7

3.1 泵前格栅的设计 7

3.1.1 概述 7

3.1.2 格栅设计参数 7

3.1.3 格栅计算 7

3.2 污水提升泵站的设计 9

3.2.1 泵房形式与工艺布置 9

3.2.2 设计参数 9

3.2.3 水泵与电机选择 9

3.2.4 吸水与压水管路设计 10

3.3 曝气沉砂池的设计 10

3.3.1 沉砂池设计参数 11

3.3.2 沉砂池设计计算 11

3.3.3 沉砂池管路设计 12

3.4 初沉池的设计 13

3.4.1 初沉池的选择 13

3.4.2 设计参数 14

3.4.3 设计计算 14

3.5 A/A/O池设计 17

3.5.1 工艺方法验证

上一篇:上海信息科技园写字楼建筑与结构设计
下一篇:气象人工服务中心建筑结构设计+CAD图纸

大连港1万吨码某矿石专用码头设计+CAD图纸

湛江1.5万吨集装箱码头设...

滨州港2万吨码头重力式码...

湛江20万吨级大型散货码头设计+CAD图纸

天津港南疆5万吨非金属矿石码头设计+CAD图纸

广州港南沙港区10万吨粮食码头设计+CAD图纸

厦门港10万吨级沉箱式集装箱码头+CAD图纸

多元化刑事简易程序构建探讨【9365字】

《醉青春》导演作品阐述

拉力采集上位机软件开发任务书

中国古代秘书擅权的发展和恶变

国内外无刷直流电动机研究现状

谷度酒庄消费者回访调查问卷表

浅谈新形势下妇产科护理...

浅谈传统人文精神茬大學...

高校网球场馆运营管理初探【1805字】

辩护律师的作证义务和保...