Requirements of the project in accordance with the annual climate weather conditions to make the library of heating, ventilating and air conditioning engineering 4D BIM project implementation plan, the program should in accordance with design specifications and technical measures of the requirements (including professional design, energy-saving design specifications, code for fire protection design and technical measures, etc.) to carry on the design. Design should be combined with the location of the project of natural geographical environment, function and characteristics of, meet the requirements of environmental protection and energy saving, to design a building central air conditioning system (warm and cold) and on the air conditioning design of energy-saving evaluation analysis, the BIM modeling software for three dimensional expression, and add the construction progress of the each step of the design. The design scheme requires that the knowledge points should be representative and advanced.
The design content mainly includes the cooling and heating load calculation, determination and system and hydraulic calculation of air-conditioning system, air conditioning cold and heat source design, pipe insulation and drawings, 3D BIM modeling and import construction schedule to complete the final 4D BIM design projects. By the book reading area, office, meeting room, atrium, affiliated with room and equipment room, a few parts, through calculation, summer cooling load index for 144.86W/ square meters of the library, a total of six layers use the floor.
Library is a public building, the flow of people is relatively large. According to the use function of the library, the room heat capacity is small, the change of the outdoor air temperature will affect the indoor indoor, and the indoor temperature is more obvious. The change of air conditioning load in the surrounding area and the direction of the room has a great influence on the internal load. In general, heating in winter and cooling in summer are needed. For small office and meeting room not distinguish between inner, outer, air conditioning system with fan coil plus fresh air system or frequency variable refrigerant flow of VRV system. For the auxiliary room and equipment room air conditioning choice, we designed two sets of air-conditioning system program: (1) VRV multi link unit (2)all-air, primary return air system. Because the atrium and pipe shaft is a closed atrium, the average temperature fluctuation is small, so the air conditioning system is not set up.
Through to the 4D BIM design, deepen understanding of building air-conditioning professional knowledge, skilled use of drawing skills, learning of BIM drawing and develop an understanding of the cognitive, understand the basic methods of scientific research in the professional field, culture independent analysis of issues, learning ability to solve practical problems by BIM software, after graduation engaged in HVAC professional work to lay a solid foundation.
目录
1 绪论    1
1.1 设计目的    1
1.2 设计依据    1
1.3 设计要求    1
1.4 设计内容    2
1.4.1 空调方案的设计    2
1.4.2 设计图纸    2
1.5 4D BIM 施工管理系统的应用功能    3
1.6 4D BIM的发展状况    3
2 暖通空调4D BIM施工进度设计    6
2.1 BIM技术的基本应用    6
2.2 4D BIM在工程上的引入    7
2.2.1 4D BIM模型的信息支撑    7
2.2.2 BIM在4D领域的应用概括    7
2.3 BIM技术应用在中国的状况    8
2.4 4D BIM 在工程应用上的简单操作流程    8
2.4.1 4D BIM 操作的基本流程    8
2.4.2 Revit基本操作界面    10
3 工程概况    11
上一篇:上海新桥镇老年文化活动中心计算书+CAD图纸
下一篇:福建省三级公路设计阶段的施工设计+CAD图纸

南京某酒店暖通空空调工程设计

温州港某散货高桩码头结构规范设计+CAD图纸

通水沟高桩式渔港工程设计+CAD图纸

上海外高桥港区五期集装...

清江浦区黄码乡周高村村...

浦东中环线高架预应力混...

进一步完善高职高专會计...

PCI+PID算法直流力矩电机速...

MNL模型历史城区居民活动...

浅析施工企业保理融资成...

小型通用机器人控制系统设计任务书

提高小學语文課堂朗读教...

高效课堂教师问卷调查表

遥感土地用变化监测国内外研究现状

《水浒传》中血腥暴力研...

从企业eHR建设谈管理信息...

大规模MIMO系统的发展研究现状