m²/h.P Noise

Temperature Relative Humidity Temperature Relative Humidity

KTV 26 -- 18 -- 30 ≤55

ballroom 26 -- 18 -- 30 ≤55

singing hall 26 -- 18 -- 30 ≤55

Room 26 -- 18 -- 30 ≤55

Longe 26 -- 18 -- 30 ≤55

Other 26 -- 18 -- 30 ≤55

Air conditioning in summer outdoor design wet bulb temperature (℃): 26.4

3.3Design Specification

[1] "code for design of heating ventilation and air conditioning (GB50019 - 2003)"

[2]Code for thermal design of civil buildings " (GB50176 - 93)

[3]"civil construction of energy-efficient design standards (heating residential buildings" (JCJ26 - 95))

[4]"public buildings energy-efficient design standards" (GB50189 - 2005)

[5]"hot summer and cold winter region residential building energy efficiency design standard" (JGJl34 - 2001)

[6]"building water and heating engineering construction quality acceptance" (GB50242 - 2002)

[7] Code for acceptance of construction quality of ventilation and air conditioning engineering "[7]." (GB50243 - 2002)

[8]"HVAC drawing standards" (GB / T50114 - 2001)

[9]. "practical heating and air conditioning design manual"

[10]. "heating and ventilation design manual"

[11]. EmergingTechmologies Combined Heat and Power For Residences.AS HRAE

[12]. JoumM (美国) [ 7 ]142 - 143(2005)

4The main work of designs

Based on analysis of original data and calculation parameters and features of the climate in Jining, Shandong Province is the main content of this part of the design, the design of construction were load calculation and characteristic analysis, the calculation results show that fresh air cooling load and solar heat gain and accounted for more than half of the total cooling load; while in winter through the doors and windows of building envelope heat transfer and cooling penetration formation heat load accounts for a majority of proportion. After comparing the system plan, taking into account the various aspects of economic construction, the final selection of fan coil plus fresh air system.

The design of air conditioning system for the wind pipe of the hydraulic calculation, as well as the indoor air volume calculation. And the multi - line system indoor and outdoor machine, fresh air system, fan, and so on were selected. The air conditioning system plan is drawn, and the design and construction specification is written.

上一篇:地质资料分析研究中心建筑与结构设计+CAD图纸
下一篇:企业社会责任信息与消费者购买意愿

某会议综合楼的消防设计

二级公路桐千线公路设计

Midas牛家沟大桥设计4*40m先...

海南省三亚市某综合购物广场的空调系统设计

南京某酒店暖通空空调工程设计

南京市某医院门诊楼空调系统设计

浮式防波堤构型设计及消波性能分析

《水浒传》中血腥暴力研...

PCI+PID算法直流力矩电机速...

遥感土地用变化监测国内外研究现状

小型通用机器人控制系统设计任务书

从企业eHR建设谈管理信息...

提高小學语文課堂朗读教...

高效课堂教师问卷调查表

浅析施工企业保理融资成...

大规模MIMO系统的发展研究现状

MNL模型历史城区居民活动...