摘要上海浦东某码头位于上海东端,浦东区包括黄浦江以东到长江口之间的三角形区域。随着改革开放以来,中国经济不断的发展,北、上、广是我国经济发展的三大城市,其中上海位于我国长江三角形口,在与外交方面,必然是我国有利的地方,它东临海,内连长江,交通非常便利,随着经济的不断发展,需求量也不断的增加,所以进口出口货物都大量上涨,于是各方面都有发展,上海港区发展对我国经济发展很重要,是我国对外联系和南北货物运输的中转,港口中的运货量增大,为了满足需求,现要建立一个码头,此码头主要运输低危品,根据当地的地质资料和水文情况,选择建立一个高桩码头,采用梁板式高桩码头。62308

本次码头的设计主要是对码头所受的荷载作用进行确定,根据荷载作用对码头的结构构件进行计算、验算他的合理性,主要的计算内容有面板内力、弯矩、剪力、配筋的计算;纵梁的计算和验算,纵梁分为轨道梁和普通纵梁;横梁的计算和验算;桩基的检验计算。其中计算时,纵梁、横梁、桩基等要借助易工软件辅助计算。

毕业论文关键词:集装箱高桩码头、面板、纵横梁、桩基

Abstract Shanghai Pudong terminal is located in the east end of Shanghai, including Pudong District East of Huangpu River to the Yangtze River Estuary between triangle region. With the reform and opening up, China economic development, the north, on the wide and is the three largest city in China's economic development, in which Shanghai is located in China's Yangtze River Delta, and in foreign affairs, is the inevitable result of China's favorable place, it even in East Linhai, the Yangtze River, the traffic is very convenient, with the continuous development of the economy, demand is also constantly increasing, so a large number of imported or exported goods are rising, so all aspects of development, Shanghai port development is very important for the economic development of China, is China's foreign relations and South transit cargo transportation, cargo ports increases, in order to meet the demand, we must establish a the main pier pier, low transport of dangerous goods, according to the geological data and local hydrological situation, choose to build a high pile wharf, the pile wharf.

Design of the wharf is mainly on the pier load is determined according to the load of wharf structures of calculation, checking his rationality, the calculation of the main content is panel force, moment, shear, reinforcement calculation; beam calculation and checking, the longitudinal beam is pided into orbit girder and beam; beam calculation and checking; inspection of pile foundation calculation. The calculation of longitudinal beam and pile foundation, etc. by easy software aided calculation.

Keywords: high pile wharf,of container plate, beam, pile foundation

第一章  绪 论 1

1.1 上海港历史发展及其现状 1

1.2上海地理位置 2

第二章  设计资料 3

2.1营运资料 3

2.1.1货运任务 3

2.1.2船舶资料 3

2.2自然条件 3

2.2.1设计水位 3

2.2.2水文 3

2.2.3 气象 4

2.2.4 地形地质 4

2.2.5地震烈度 4

第三章  码头平面布置 5

上一篇:广州港港区2万吨级集装箱码头设计及施工组织设计+CAD图纸
下一篇:扬州港某3000吨集装箱码头结构规范设计+CAD图纸

某会议综合楼的消防设计

海南省三亚市某综合购物广场的空调系统设计

南京某酒店暖通空空调工程设计

南京市某医院门诊楼空调系统设计

四层某校综合楼消防设计

上海港张华浜港区9#集装箱...

天津市某社区文体中心能耗分析及节能研究

《水浒传》中血腥暴力研...

高效课堂教师问卷调查表

MNL模型历史城区居民活动...

提高小學语文課堂朗读教...

浅析施工企业保理融资成...

PCI+PID算法直流力矩电机速...

小型通用机器人控制系统设计任务书

从企业eHR建设谈管理信息...

大规模MIMO系统的发展研究现状

遥感土地用变化监测国内外研究现状