Sodium lauryl polyoxyethylene(3) hexyl sulfosuccinate was synthesized by using lauryl polyoxyethylene(3)、hexanol、sodium hydroxide、maleic anhydride、sodium hydrogen sulfite as main raw materials.At first, under the catalysis of toluene sulfonic acid ,monoester can be made by lauryl polyoxyethylene(3) and maleic anhydride.Next,we make the second-step production reaction by using monoester and hexanol.Then,neutralization reaction was carried out by monoester and sodium hydroxide.The production made in the neutralization is used to be the catalyzer for the last reaction. The final product is reacted by diester and Sodium hydrogen sulfite.

4.Design standard

Design standard, including the following factors need to be sure before design.

(1)Sure of the specifications of the products and raw materials

The specifications of the products shall be in accordance with the requirements of the use,and meet the market for the principle. According to the purity, chemical products can have different levels and must be made to the specifications of the products in the design specification, in order to determine the process flow.If you increase the product refining process, improve the purity level to obtain economic benefits, they should be carefully considered in the process of design, to achieve the requirements.

(2)Sure of the scale of production

Design task book should make the scale of production clearly, has been issued, shall not be changed, otherwise it will cause confusion in the design work.

(3)Sure of the mode of operation

Continuous operation process has some advantages,such as high utilization rate of equipment, strong production capacity,stable production process , easily-realized automatic control. The intermittent operation process has the advantages of flexibility and flexibility, which is more suitable for the production of fine chemical products. What kind of operation should be taken in the process of design, need to be determined at first.

(4)Sure of the construction factor

Construction factor is defined as: production device starting time/year. To make full use of the equipment, construction factor should be larger, close to 1, but it can't be equal to 1, because consider the maintenance and inspection equipment and open parking. Construction factors generally in 0.8-0.9, the annual production of 300-300 days, or years production 7000-8000 hours. For market uncertainty, technology owe mature project, construction factors desirable to slightly lower, in order to achieve better productivity elasticity.

Sure of specification of raw materials:AEO-3:99.00%,maleic anhydride:99.90%,hexanol:99.50%,NaOH:30.00%,sodium hydrogen sulfite:99.00%

Sure of the scale of production:600t/Y

Sure of the mode of operation: intermittent operation

Sure of the start factor: 300 days / year, operating two shifts system

目  录

1  绪论 1

1.1  产品概述 1

1.1.1  产品简介 1

1.1.2  产品发展 1

1.1.3  产品结构特点 1

1.2  设计依据 2

1.3  设计原则 2

1.4  设计标准 3

文献综述 4

2.1  国内生产概况及市场概况 4

2.2  国内前景概况 4

2.3  世界发展概况 5

2.4  阴离子表面活性剂的应用 5

2.4.1  建筑工业

上一篇:日处理8万吨城市污水的处理工艺设计+CAD图纸
下一篇:HCl预处理对水稻秸秆沼气产量的影响

江苏彩云年产182.5万条中高...

年产40万吨聚丙烯项目可行性研究

Aspen年产30万吨环氧丙烷项...

年产30万吨环氧丙烷可行性研究

年产40万吨聚丙烯项目技术...

年产40万吨聚丙烯项目工艺...

年产40万吨聚丙烯项目设备设计与选型

多元化刑事简易程序构建探讨【9365字】

浅谈传统人文精神茬大學...

中国古代秘书擅权的发展和恶变

《醉青春》导演作品阐述

国内外无刷直流电动机研究现状

高校网球场馆运营管理初探【1805字】

拉力采集上位机软件开发任务书

辩护律师的作证义务和保...

谷度酒庄消费者回访调查问卷表

浅谈新形势下妇产科护理...