The part of sludge concentration adopt gravity pool which use the concentration difference between the solid particles and the water in the sludge to achieve mud separation which can reduce the sludge moisture content and the sludge volume。 It can also save investment, reduce processing costs。

First of all, wastewater through the sieve and the regulating reservoir before raised by the sewage pump, and then through the hydrolysis acidification tank, secondary settling tank, biological contact oxidation tank and coagulation sedimentation tank could discharge after a series of biological and chemical processing。

The whole process is completed by gravity, which can save energy and reduce the cost of wastewater treatment, and the operation is simple and easy to manage。

This design is aim to enable students to apply what they have learned about wastewater treatment (especially industrial waste water, such as printing and dyeing wastewater treatment) to practical design, which is based on the printing and dyeing wastewater treatment system process design。 It can improve students’ comprehensive ability to solve practical problems, too。 Design specifications, plan layout, process flow chart and the main structure of the monomer map are finished according to the established process and dimensional design and calculation。

The design cost of 3。1903 million yuan, the operation cost is 2。7 yuan /m3, the whole design process of less capital cost, treatment effect is good and operation management simply。 Also, secondary pollution is lesser than other treatments。

After treating the wastewater, the water is expected to achieve <Industrial wastewater standard for textile dyeing and finishing industry>(GB4287-2008)table 2: CODcr: ≤80mg/L, BOD5: ≤20mg/L, SS: ≤50mg/L, pH: 6~9, chromaticity: 50(Times)。

Key words: printing and dyeing wastewater; biological contact oxidation; discharge standard

1 绪论 1

1。1 设计原则与依据 1

1。1。1 设计原则 1

1。1。2 设计依据 1

1。2 工程概况 1

2 处理工艺的选择 3

2。1 进水水质分析 3

2。2 预处理阶段 4

2。2。1 预处理工艺的选择 4

2。2。2 主体工艺的选择 4

2。3 污水处理设计方案的确定 6

3 构筑物的设计与计算 7

3。1设计说明 7

3。2 废水处理各单元的运行效果 7

3。3 筛网 8

3。3。1 设计计算 8

3。3。2 筛网选型 8

3。4调节池 9

3。4。1池体积算 9

3。4。2 布气管设置 10

3。4。3 鼓风机的选型 12

3。5 水解酸化池 13

3。5。1 池体积算 13

3。5。2布水配水系统 13

3。6 生物接触氧化池 15

3。6。1 填料的选择与安装 15

3。6。2 池体的设计计算 16

3。6。3曝气装置

上一篇:日处理20000立米城镇污水处理厂工程工艺设计+CAD图纸
下一篇:辣椒红色素提取工艺的研究

锡铋掺杂钛电极的制备及降解染料废水研究

日化包装公司香水瓶生产项目环境风险评价

缺氧-好氧生物流化床去除...

温州市大顺机械公司改建...

次氯酸直接氧化分散大红染料废水的研究

次氯酸直接氧化分散蓝染料废水的研究

年产1万头出栏生猪养猪场生产废水处理方案

谷度酒庄消费者回访调查问卷表

中国古代秘书擅权的发展和恶变

高校网球场馆运营管理初探【1805字】

多元化刑事简易程序构建探讨【9365字】

国内外无刷直流电动机研究现状

《醉青春》导演作品阐述

浅谈新形势下妇产科护理...

辩护律师的作证义务和保...

浅谈传统人文精神茬大學...

拉力采集上位机软件开发任务书