[2]Cheng J S. Mine Mechanism[M]. Xuzhou: China University of Mining and Technology Press, 1997. (In Chinese)
[3]Xiao H X. Introduction on electric hydraulic control system of hydraulic powered support in coal raining face with coal plough[J]. Coal Science and Technology, 2001 (11): 13-14. (In Chinese)
[4]Chen Y L. Chinese Mining Technology of Plough[M]. Bei¬jing: Publishing House of Coal Industry, 2000. (In Chi¬nese)
[5]Zhang W. Constraints between the powered supports and other coal raining machine and its automatic control model[J]. Journal of China University of Mining and Tech¬nology, 2005(3): 349-352. (In Chinese)
[6]Zhang W, Han X J. The microcomputer distributed sys¬tem of powered supports for synthetical mechanized mining face[J]. Mining and Processing Equipment, 2002(2): 17-19. (In Chinese)
液压支架试验台计算机测控系统
摘要——完成了支架试验台计算机监控系统的设计与开发;首先在分析液压支架试验台的结构功能和MT312-2000试验标准的基础 上,确定了基于上下位机的系统设计方案,-按照安全性、实时性和可靠性的要求,进行了硬件的选型和控制回路的设计;采用VB6.0 开发了具有良好人机界面的上位机软件!建立了试验过程管理信息系统,实现了试验数据的管理及报表打印;利用STEP7开发了下位 机控制软件,实现了试验过程的自动控制;在自由口模式下,采用VB中的MSComm控件实现了监控系统的通信,该系统工作稳定可 靠且检测精度高,已用于目前国内最大的液压支架试验台,降低了成本,且提髙了检测效率。论文网
关键词——液压支架试验台;监控系统I数据库;PLC控制
0引言
我国是世界上最大的煤炭生产国和消费国,煤炭产量和需求量逐年增加。今后50年内,煤炭作为主要能源的格局不会改变。但是长期以来,煤矿安全问题一直制约着中国煤炭工业的发展。液压支架作为综采工作面的关键支护设备,近年来发展非常迅速。为了满足煤矿开采高产高效的要求,其强度和技术含量要求越来越髙,因此对检测设备的性能也提出了越来越高的要求。但由于国内现有的测控系统仍存在一些不足之处, 如结构繁琐、不易文护、成本较高,难以推广、编程复杂和研发不便等,因此阻碍了液压支架产品的开发和市场推广[1]。
本课题采用了成本低廉、技术先进的自动化技术工具,设计开发了结构紧凑、性能可靠、自动化程度高的液压支架试验台计算机监控系统,为液压支架检测试验提供了必要条件。
上一篇:关于ERP的英文文献和中文翻译
下一篇:快速热循环注塑模英文文献和中文翻译

液压系统的故障检测英文文献和中文翻译

煤矿液压支架的电液控制...

起重机液压系统支腿的智...

液压在移动嵌入式设备中...

液压泵系统识别方法比较英文文献和中文翻译

液压疲劳试验机电动机无...

液压系统英文文献及中文翻译

人事管理系统开题报告

浅谈动画短片《天降好运》中的剧本创作

淮安市老漂族心理与休闲体育现状的研究

紫陵阁

林业机械作业中的安全性问题【2230字】

大学生就业方向与专业关系的研究

组态王文献综述

适合宝妈开的实体店,适...

小学《道德与法治》学习心得体会

弹道修正弹实测弹道气象数据使用方法研究