5 yrs 5 yrs little joint movement

2 3 4 5 6

Expert Rating of Field Performance

2。5 yrs 5 yrs

Figure 9。 Lab results for heat resistance (left) and GPC polymer degradation (right) as compared to the expert assessment over a time period of five years

12。5 13。0 13。5 14。0 14。5 15。0

Analysis Time [min]

Figure 10。 GPC-chromatograms of polymers in the BEJ binder; segregation in container of filling material (left); BEJ filling material C with different quality at different installation locations (right): NW good reference, AG overheated, TI smaller polymers

GPC, as required by the guidelines [7], proved to be an extremely valuable tool。 It allows determining the polymer decomposition due to the installation process, hence providing a means of verifying heat sensitivity of the most common polymers in the binder and deter- mining thermal damage of the binder。 Figure 10 shows how GPC allows detecting segrega- tion of the polymer in the container of the filling material as well as differences in material and installation quality。 In the diagram to the right, "System C: NW" shows the  highest

content of polymers with largest molecule size。 As compared to this, the largest peak in case of "System C: TI" is much smaller and a little bit shifted to the right。 This indicates that the composition of this presumably same binder was most probably not identical。 In case of "System C: AG" the main peak is not shifted to the right, but much smaller and the second peak (which is also not shifted) becomes significantly higher。 From this, one would conclude that the material was originally identical to the "System C: NW" but had suffered considerable overheating and molecular damage (smaller size of the molecules)。

5 Behavior of wide bituminous plug expansion joints after heavy traffic

5。1 MMLS3 field testing of wide BEJs on a multi-span bridge

In some special cases it may be necessary to install BEJs with a width exceeding 500 mm。 This may hold for multi-span bridges where the construction requires merging two plug joints (Fig。 11) or in case of BEJ replacement, when the locally cracked or deteriorated pavement needs to be cut-off on the side of the trench。 In order to account for such situa- tions, condition and performance of ten special BEJs were investigated after heavy traffic loading and weathering, immediately prior to demolition of the relevant bridge structure。

The plug joints were located on a series of 80 m span slope-side bridges of the A2 mo- torway in the Mediterranean southern part of Switzerland (TI,2 in Fig。 8) with a traffic vo- lume in each direction of 30'000 vehicles per day。 The width of these plug joints ranged be- tween 750 mm to 1'370 mm, thus considerably exceeding the standard width of 500 mm specified by Swiss guidelines [7]。 The horizontal design movement was between 8 to 48 mm as indicated in Figure 11。

Figure 11。 Wide BEJ systems, northbound MMLS3 testing sites and 7 year visual performance on Motorway A3 in southern Switzerland。

The goal of this study was to evaluate long term performance over and after a loading pe- riod of seven years, the assessment of specific refurbishing and repair actions undertaken immediately before the observed loading period as well as the investigation of the remain- ing rutting potential before demolition of the bridge。

上一篇:截止阀中空化现象英文文献和中文翻译
下一篇:建筑物入口的空气渗透英文文献和中文翻译

移动码头的泊位分配问题英文文献和中文翻译

纤维素增强的淀粉-明胶聚...

多极化港口系统的竞争力外文文献和中文翻译

阻尼减震平台的设计英文文献和中文翻译

超精密自由抛光的混合机...

旋转式伺服电机的柔性电...

过程约束优化数控机床的...

压疮高危人群的标准化中...

提高教育质量,构建大學生...

浅谈高校行政管理人员的...

AES算法GPU协处理下分组加...

STC89C52单片机NRF24L01的无线病房呼叫系统设计

上海居民的社会参与研究

基于Joomla平台的计算机学院网站设计与开发

浅论职工思想政治工作茬...

酵母菌发酵生产天然香料...

从政策角度谈黑龙江對俄...