There are 16 platen superheaters, 12 platen reheaters and 8 wingwalls near the front wall and the rear wall of the furnace。 The cross-section of the furnace is 16。629 m (depth) ×16。617 m (width), the height of the furnace is

39。5 m。 The inner diameter of the cyclone is 8。3 m。 The convection pass is pided into two parts (front pass and back pass)。 Six roller ash coolers are set on the inside of the pantleg。 A tubular air preheater is equipped。

No。2 boiler: The general arrangement of this 300MWe CFB boiler is seen in Fig。 3。 It mainly includes pantleg furnace, four hot cyclone separators, a loop seal and a EHE under each cyclone separator。 Four EHEs are sym- metrically arranged on both sides of the lower part of the furnace, high temperature reheater(HTR) and low tem- perature superheater(LTS) are arranged in the two EHEs near the front of the furnace, they are mainly used for regulating reheated steam temperature and meanwhile effectingthe bedtemperature。Medium temperature su-

Fig。1Different arrangements of the heating surfaces in CFB boilers

Fig。 2General Arrangement of No。1 Boiler

Fig。 3General Arrangement of No。2 Boiler

perheaterⅠ(MTSⅠ)and medium temperature superhea- terⅡ(MTSⅡ)are arranged in the two EHEs nearthe back of furnace, which are mainly used for regulating the bed temperature and meanwhile taking into account the effect on bed reheated steam temperature。 Each EHE has an independent material feed inlet and an independent material return outlet。 High temperature circulation solids entering into the EHE under the regulation of the cone

valve conducts heat exchange with submerged tube heat- ing surface, and then returning cooled ash to the furnace, thereby regulating the bed temperature and steam tem- perature。

No。3 boiler: A commercial 300 MWe CFB boiler with single furnace, natural circulation and circulating fluid- ized bed combustion (Fig。 4)。 The boiler is composed of three main parts - a furnace with a waterwall membrane, three steam-cooled cyclone separators on the back of the furnace, a twin-exit loop seal at the end of each cyclone standpipe and the convection pass。 There are 12 platen superheaters, 6 platen reheaters and 2 wingwalls near the front wall and the rear wall of the furnace。 The cross- section of the furnace is 8。439 m (depth) ×28。275 m (width), the height of the furnace is 39。3 m。 The inner diameter of the cyclone is 8。5 m。 The convection pass is pided into two parts (front pass and back pass)。 Six roller ash coolers are set on the back of the furnace。 A tubular air preheater is equipped。

Fig。 4General Arrangement of No。3 Boiler

Steam-water circuits of the three boilers

No。1 boiler: Fig。5 shows steam-water system of No。1 boiler。 Feed water enters the in-line horizontal econo- mizertubeslocatedintheconvectionbackpass。The

drum receives pre-heated water from the economizer and feeds it to the evaporator。 The evaporative surfaces of the boiler consist of the combustor waterwall and wing wall in the furnace。 Drum internals separate and purify the saturated steam before it feeds the steam to the enclosure of the convection pass。 The steam is further heated in the

superheater stageⅠlocated above the economizer in the

back pass of convection pass。 After the first stage attem- perator the steam flows to the second stage platen super- heater in the furnace, it is pided into two parts: 8 pieces ofplatensuperheateraresecondsuperheaterI (SSⅠ),

which are arranged near the front wall of furnace, another

8 pieces of platen superheater are second superhea- terⅡ(SSⅡ), which are arranged near the rear wall of furnace。 The second attemperator is arranged between the

second stage superheater and the final superheater。 The final superheater is the first heating surface in the back pass of the convection pass。

上一篇:数字通信技术在塑料挤出工艺中的应用英文文献和中文翻译
下一篇:碳化硅电器元件的应用英文文献和中文翻译

脑电图像P300机器人手臂运...

5300TEU集装箱船规格书英文文献和中文翻译

非线性循环行为混杂纤维...

质量有缺陷的滚动轴承振...

快速热循环注塑模英文文献和中文翻译

快速热循环注塑模具英文文献和中文翻译

提高教育质量,构建大學生...

压疮高危人群的标准化中...

上海居民的社会参与研究

浅谈高校行政管理人员的...

酵母菌发酵生产天然香料...

AES算法GPU协处理下分组加...

基于Joomla平台的计算机学院网站设计与开发

STC89C52单片机NRF24L01的无线病房呼叫系统设计

浅论职工思想政治工作茬...

从政策角度谈黑龙江對俄...