3.    Design Basis
3.1    Location
Shanghai Latitude: 31.1; Longitude: 121.4; Altitude (m): 2.6
3.2    Meteorological parameters
1、 atm: Winter 102.51Kp, summer: 100.53 Kp. ,
2、 outdoor computing (dry bulb) temperature (℃)
Winter    Summer
Heating    Air conditioning    The lowest average daily    Ventilation    Air conditioning    Air conditioning daily average    daily range    Ventilation
-2    -4    -6.9    3    34    30    7.1    32
3. Summer air conditioning outdoor calculation of the wet bulb temperature (c): 28.2
       4.indoor design parameters
The design of air conditioning in summer temperature: 26 ℃, wind speed less than 0.3 m/s
Winter air conditioning design temperature: 20 ℃, wind speed less than 0.2 m/s
Use of the room    The summer temperature    The winter temperature    Relative humidity in summer     Relative humidity in winter      Personnel density    Lighting standard    Fresh air supply
    (℃)     (℃)     (%)     (%)     (p/m^2)    (W/m^2)(m^3/h.p)    (次/h)
Computer Room    22.0    20.0      55      50    0.153     7.0    50.0
Office    26.0    20.0    60    50    0.148    9.0     50.0
Reading Room    26.0    20.0    60    50    0.624    9.0     1.0
Lobby    26.0    20.0    60    50    0.162    13.0    2.0


3.3    Design specifications
1, <heating, ventilation and air conditioning automatic control specification>;
2, <energy saving design standard>;
3, <heating ventilation and air conditioning design specification>;
4, <heating ventilation and air conditioning drawings standard>;
5, <fire protection design of tall buildings>
6,<national technical measures for design of civil construction -- HVAC, power>
7, <HVAC drawing standard>
8, <heating ventilation and air conditioning in terms of standard>

4.    The main task of the design
According to the requirements of information building air conditioning system design of 3-4. The specific content of the air conditioning system design of information building area 3-4 and smoke control system; cooling and heating load calculation; according to the load, combined with the features of buildings, the preliminary determination of air conditioning system; air conditioning system according to the selection of main equipment, air conditioning system; design and calculation of air conditioning system; determine the indoor air and indoor position, check indoor air flow organization; involved in the design to the construction of smoke control problem, the necessary discussion and explanation; drawing; write design calculation manual and completed many drawings drawing. And according to the study of basic theory and professional knowledge, combined with the actual project, according to the engineering design specifications, standards, design drawings and relevant reference data, complete the required engineering design. The design scheme is reasonable, practical, accurate calculation, chart.
上一篇:midas70+120+70高速铁路连续梁桥设计+CAD图纸
下一篇:城市综合体建筑设计说明+文献综述

海南省三亚市某综合购物广场的空调系统设计

南京某酒店暖通空空调工程设计

南京市某医院门诊楼空调系统设计

申港中心E区空调系统设计及UFAD送风方案设计

谈高大空间建筑暖通空调设计【2533字】

空调冷冻水系统压差调节...

浅谈建筑暖通空调节能優...

谷度酒庄消费者回访调查问卷表

拉力采集上位机软件开发任务书

高校网球场馆运营管理初探【1805字】

浅谈传统人文精神茬大學...

国内外无刷直流电动机研究现状

多元化刑事简易程序构建探讨【9365字】

浅谈新形势下妇产科护理...

辩护律师的作证义务和保...

中国古代秘书擅权的发展和恶变

《醉青春》导演作品阐述