3.    Design Basis
3.1    Location
Shanghai Latitude: 31.1; Longitude: 121.4; Altitude (m): 2.6
3.2    Meteorological parameters
1、 atm: Winter 102.51Kp, summer: 100.53 Kp. ,
2、 outdoor computing (dry bulb) temperature (℃)
Winter    Summer
Heating    Air conditioning    The lowest average daily    Ventilation    Air conditioning    Air conditioning daily average    daily range    Ventilation
-2    -4    -6.9    3    34    30    7.1    32
3. Summer air conditioning outdoor calculation of the wet bulb temperature (c): 28.2
       4.indoor design parameters
The design of air conditioning in summer temperature: 26 ℃, wind speed less than 0.3 m/s
Winter air conditioning design temperature: 20 ℃, wind speed less than 0.2 m/s
Use of the room    The summer temperature    The winter temperature    Relative humidity in summer     Relative humidity in winter      Personnel density    Lighting standard    Fresh air supply
    (℃)     (℃)     (%)     (%)     (p/m^2)    (W/m^2)(m^3/h.p)    (次/h)
Computer Room    22.0    20.0      55      50    0.153     7.0    50.0
Office    26.0    20.0    60    50    0.148    9.0     50.0
Reading Room    26.0    20.0    60    50    0.624    9.0     1.0
Lobby    26.0    20.0    60    50    0.162    13.0    2.0


3.3    Design specifications
1, <heating, ventilation and air conditioning automatic control specification>;
2, <energy saving design standard>;
3, <heating ventilation and air conditioning design specification>;
4, <heating ventilation and air conditioning drawings standard>;
5, <fire protection design of tall buildings>
6,<national technical measures for design of civil construction -- HVAC, power>
7, <HVAC drawing standard>
8, <heating ventilation and air conditioning in terms of standard>

4.    The main task of the design
According to the requirements of information building air conditioning system design of 3-4. The specific content of the air conditioning system design of information building area 3-4 and smoke control system; cooling and heating load calculation; according to the load, combined with the features of buildings, the preliminary determination of air conditioning system; air conditioning system according to the selection of main equipment, air conditioning system; design and calculation of air conditioning system; determine the indoor air and indoor position, check indoor air flow organization; involved in the design to the construction of smoke control problem, the necessary discussion and explanation; drawing; write design calculation manual and completed many drawings drawing. And according to the study of basic theory and professional knowledge, combined with the actual project, according to the engineering design specifications, standards, design drawings and relevant reference data, complete the required engineering design. The design scheme is reasonable, practical, accurate calculation, chart.
上一篇:midas70+120+70高速铁路连续梁桥设计+CAD图纸
下一篇:城市综合体建筑设计说明+文献综述

海南省三亚市某综合购物广场的空调系统设计

南京某酒店暖通空空调工程设计

南京市某医院门诊楼空调系统设计

申港中心E区空调系统设计及UFAD送风方案设计

谈高大空间建筑暖通空调设计【2533字】

空调冷冻水系统压差调节...

浅谈建筑暖通空调节能優...

遥感土地用变化监测国内外研究现状

PCI+PID算法直流力矩电机速...

大规模MIMO系统的发展研究现状

从企业eHR建设谈管理信息...

MNL模型历史城区居民活动...

《水浒传》中血腥暴力研...

小型通用机器人控制系统设计任务书

提高小學语文課堂朗读教...

高效课堂教师问卷调查表

浅析施工企业保理融资成...