Design on the basis of the "Shanghai applied technology college graduation design (Thesis) task book; the civil building heating, ventilation and air regulation design specification" GB50736-2012; "public buildings energy-efficient design standards," (gb50189-2005); "anti fire code of design of tall buildings" (gb50045-2005); the heating, ventilation and air regulating drawing standard "GBJ114-88;" practical heating and air conditioning design manual "(Second Edition);" code for fire protection design of buildings "(GB50016-2006). The concise air conditioning design manual"; "air conditioning engineering"; the building environment and equipment engineering system analysis and design, "the.
Building five to sixteen layers of air-conditioning area of about 27842.9 square meters, each air conditioning area of about 2320.24 square meters, the total cooling load of about 3625KW. Most commercial center of the upper layer district office room for the office, conference room, storage room, air conditioning, mainly operating time to work during the day time by fan coil plus fresh air unit group this semi centralized air-conditioning system. Fan coil unit and air conditioning system, convenient for independent control, and the wind pipe occupied by the indoor space is less, suitable for office buildings. Using embedded concealed fan coil units, fan coil undertake indoor total cooling load; each layer of fresh air in the engine room set a fresh air handling units, fresh air and fan coil air separate into the air conditioning room, wind pipe mainly using rectangular duct, air supply mode selection is under the blower air supply mode, were choose square diffuser and return air for the double decker Venetian air return. The water system uses two control and program.
Load calculation for each room, chiller, fan coil, air handling units selection; carries on the design to the water system, air system, and hydraulic calculation, determine the wind pipe and water pipe size, check the most disadvantaged loop resistance, air blower and water pump specifications.
Smoke exhaust design, staircase and vestibule by mechanical pressurized air supply, the fan is arranged in the roof; closed in the aisle and room to take measures of mechanical smoke exhaust and fan is arranged at the top of a building, usually exhaust, fire smoke. Toilet set exhaust fan.
This design for undergraduate graduation design. Reference to many documents, specifications, drawings, engineering examples, the theoretical analysis and calculation, and the design scheme selection and demonstration of the project and decorated with the design drawings, is a complete air conditioning engineering design. The main calculation of the design include: load calculation, air quantity calculation, air flow organization design calculation, pipeline hydraulic calculation.
Finally, the air conditioning system of the pipeline and equipment using the muffler damping and adiabatic anti-corrosion measures.
Due to low level of personal, some mistakes and errors are inevitable, design inadequacies also please teachers to give the criticism.
KeyWords: air conditioning system; design; fan coil; water system; air system; energy conservation
目录
1 绪论...1
1.1 空调系统发展及设计的现状.1
1.2 空调的节能     1
1.3 设计的主要内容.1
2 工程概况    ...1
2.1 原始资料.1
2.2 建筑相关资料.2
2.3 室外设计参数.2
2.4 室内设计参数.2
2.5 围护结构参数.2
3 空调冷负荷计算...3
3.1 冷负荷理论根据.3
3.1.1 房间冷负荷的构成..3
3.1.2 房间湿负荷的构成..3
3.2 冷负荷的计算方法与主要计算公式.3
3.2.1 外墙和屋顶瞬变传热引起的冷负荷..3
3.2.2 外玻璃窗瞬变传热引起的冷负荷..3
3.2.3 透过玻璃窗的日射得热形成冷负荷的计算方法..3
上一篇:某高层小区居民楼防排烟设计
下一篇:大学宿舍楼建筑与结构设计+CAD图纸

上海华漕镇社区图书馆建筑与结构设计

临港张江中心商务办公设计

上海港张华浜港区9#集装箱...

天津市某社区文体中心能耗分析及节能研究

申港中心E区空调系统设计及UFAD送风方案设计

上海横沙港区1#散货码头结构设计+CAD图纸

上海外高桥港区五期集装...

辩护律师的作证义务和保...

多元化刑事简易程序构建探讨【9365字】

浅谈新形势下妇产科护理...

《醉青春》导演作品阐述

高校网球场馆运营管理初探【1805字】

谷度酒庄消费者回访调查问卷表

拉力采集上位机软件开发任务书

国内外无刷直流电动机研究现状

浅谈传统人文精神茬大學...

中国古代秘书擅权的发展和恶变