Ratx =     1.0000        Raty =     1.0000
  Ratx1=     1.6512        Raty1=     1.6383
  Ratx2=     1.2842        Raty2=     1.2742
  薄弱层地震剪力放大系数= 1.00
  RJX1 = 2.7248E+07(kN/m)  RJY1 = 4.1586E+07(kN/m)  RJZ1 = 0.0000E+00(kN/m)
  RJX3 = 5.3743E+05(kN/m)  RJY3 = 5.8289E+05(kN/m)  RJZ3 = 0.0000E+00(kN/m)
  RJX3/H = 1.8532E+05(kN/m)  RJY3/H = 2.0100E+05(kN/m)  RJZ3/H = 0.0000E+00(kN/m)
 ---------------------------------------------------------------------------
  Floor No.  17     Tower No.   1
  Xstif=    10.6837(m)     Ystif=    17.3067(m)     Alf  =     0.0000(Degree)
  Xmass=    11.2224(m)     Ymass=    16.0775(m)     Gmass(活荷折减)=   585.0012(   542.5070)(t)
  Eex  =     0.0405        Eey  =     0.1103
  Ratx =     1.0000        Raty =     1.0000
  Ratx1=     1.9433        Raty1=     1.9096
  Ratx2=     1.5115        Raty2=     1.4852
  薄弱层地震剪力放大系数= 1.00
  RJX1 = 2.7248E+07(kN/m)  RJY1 = 4.1586E+07(kN/m)  RJZ1 = 0.0000E+00(kN/m)
  RJX3 = 4.6498E+05(kN/m)  RJY3 = 5.0828E+05(kN/m)  RJZ3 = 0.0000E+00(kN/m)
  RJX3/H = 1.6034E+05(kN/m)  RJY3/H = 1.7527E+05(kN/m)  RJZ3/H = 0.0000E+00(kN/m)
 ---------------------------------------------------------------------------
  Floor No.  18     Tower No.   1
  Xstif=    10.9295(m)     Ystif=    17.4430(m)     Alf  =     0.0000(Degree)
  Xmass=    11.1681(m)     Ymass=    15.9069(m)     Gmass(活荷折减)=   649.3231(   604.8802)(t)
  Eex  =     0.0174        Eey  =     0.1372
  Ratx =     1.0000        Raty =     1.0000
  Ratx1=     7.3873        Raty1=     6.9049
  Ratx2=     3.5452        Raty2=     3.3137
  薄弱层地震剪力放大系数= 1.00
  RJX1 = 2.7248E+07(kN/m)  RJY1 = 4.1586E+07(kN/m)  RJZ1 = 0.0000E+00(kN/m)
  RJX3 = 3.4181E+05(kN/m)  RJY3 = 3.8025E+05(kN/m)  RJZ3 = 0.0000E+00(kN/m)
  RJX3/H = 1.1787E+05(kN/m)  RJY3/H = 1.3112E+05(kN/m)  RJZ3/H = 0.0000E+00(kN/m)
 ---------------------------------------------------------------------------
  Floor No.  19     Tower No.   1
  Xstif=    10.2114(m)     Ystif=    19.8155(m)     Alf  =     0.0000(Degree)
  Xmass=    11.0352(m)     Ymass=    16.5350(m)     Gmass(活荷折减)=   145.5136(   144.2482)(t)
上一篇:五层钢筋混凝土现浇框架结构设计+CAD图纸
下一篇:省道公路设计计算书+CAD图纸

上海华漕镇社区图书馆建筑与结构设计

新能源技术在建筑节能中的应用

安徽省涡阳县污水处理厂建筑与施工报告

上海市杨浦区C4-1地块养老院建筑设计

论营改增對建筑企业會计...

论建筑施工企业會计核算...

论建筑施工企业會计信息...

拉力采集上位机软件开发任务书

《醉青春》导演作品阐述

高校网球场馆运营管理初探【1805字】

中国古代秘书擅权的发展和恶变

辩护律师的作证义务和保...

浅谈新形势下妇产科护理...

国内外无刷直流电动机研究现状

多元化刑事简易程序构建探讨【9365字】

浅谈传统人文精神茬大學...

谷度酒庄消费者回访调查问卷表