My since 50 generation medium-term began built prestressed concrete beam bridge, has has has more than 40 years of history, than European started late, but near on years to development quickly, in prestressed concrete bridge of design, and structure analysis, and test research, and prestressed material and the technology equipment, and construction technology, aspects changing, prestressed concrete beam bridge of design technology and construction technology are has reached quite high of level.
Although China's prestressed concrete continuous beam in constant development, but with the international advanced level there is still a certain gap. To catch up with the international advanced level, we must solve the following questions:
1 the development of large tonnage anchorage and tension system, avoid excessive increases with the beam of box girder structure size, otherwise it is difficult to guarantee the protective layer of concrete, prestressed pipeline dense and reinforced layers stacked so difficult to improve the quality of concrete.
2 in all appropriate bridge site, design and construction of pier and beam of continuous rigid frame, using the least possible big tonnage support maintenance replacement is not easy.
3 give full play to the advantages of three prestressed, with long cantilever roof single box section, can save materials, reduce the weight of structure, but also can make full use of the cantilever construction method to speed up the construction progress.
In addition, in the design of prestressed continuous beam bridge, technical and economic index is a very key factor, it is the logo design scheme is reasonable and economic. At present, all the countries to three per square metre (wood deck concrete, prestressed, reinforced) amount and the cost per square metre bridge to represent economic and technical index of prestressed concrete bridge. However, the research and analysis of technical and economic indexes of bridge is a very complicated work, three material index and cost index, with many factors such as: the bridge site, hydrogeology, energy supply, material supply, transportation, navigation, planning, construction site conditions; construction of modernization, product, price, industrialization labor and material mechanical industrial base, national infrastructure conditions. At the same time, complete the design of a bridge, cost index can not only reflect the size of investment, but also should include the use of period of maintenance, repair and operating expenses. Through continuous beam, T type rigid frame, continuous rigid frame, the comparison of the structure of box section can be found: continuous rigid-frame structure with high technical and economic index system. Therefore, from this point of view, continuous rigid frame is the future development direction of one continuous system.
目录
1 序言    1
2 设计资料    3
2.1 工程概况    3
2.2 设计规范和标准    3
2.3 设计技术标准    3
2.3.1 设计荷载    3
2.3.2 设计车速    3
2.3.4 桥面横向布置    3
2.3.5 桥面坡度    4
2.3.6 结构抗震    4
2.3.7 规划河道断面图    4
2.4 基本资料    4
2.4.1 工程地质    4
2.4.2 场地水文地质条件    6
3 桥梁结构的总体布置和初步方案拟定    7
3.1 方案一:简支梁桥    7
3.1.1 设计思路    7
3.1.2 跨径划分和总体布置    7
3.1.3 上部主要结构尺寸拟定    8
3.1.4 下部主要结构尺寸拟定    8
3.1.5 标高计算    8
3.1.6 施工方案    9
3.2 方案二:T形钢构桥    9
上一篇:某区域污水收集系统规划文本编制+节点流量图
下一篇:七层综合办公楼建筑给排水设计+CAD图纸

Midas牛家沟大桥设计4*40m先...

浦东中环线高架预应力混...

连续编制合并财务报表中...

MIDAS预应力马鞍板构件的徐变效应研究

预應力混凝土结构火灾研...

预應力混凝土施加應力前...

陶粒混凝土茬高层建筑现...

小型通用机器人控制系统设计任务书

提高小學语文課堂朗读教...

遥感土地用变化监测国内外研究现状

大规模MIMO系统的发展研究现状

MNL模型历史城区居民活动...

从企业eHR建设谈管理信息...

《水浒传》中血腥暴力研...

高效课堂教师问卷调查表

PCI+PID算法直流力矩电机速...

浅析施工企业保理融资成...