JmaxD    Max-Dy      Ave-Dy    Max-Dy/h      DyR/Dy    Ratio_AY
    4      1       371      20.22       18.46         4500.
                   369       1.99        1.83       1/2262.    72.0%       1.00
    3      1       267      18.31       16.73         4500.
                   271       3.64        3.21       1/1237.    65.7%       1.31
    2      1       152      14.71       13.55         4500.
                   152       5.89        5.34       1/ 763.    19.5%       1.74
    1      1        37       8.83        8.23         5800.
                    37       8.83        8.23       1/ 657.    99.4%       1.53
 
   Y方向最大层间位移角:               1/ 657.(第  1层第 1塔)

  === 工况  5 === Y+ 偶然偏心地震作用下的楼层最大位移

  Floor  Tower    Jmax     Max-(Y)     Ave-(Y)       h
                  JmaxD    Max-Dy      Ave-Dy    Max-Dy/h      DyR/Dy    Ratio_AY
    4      1       392      19.77       18.50         4500.
                   392       1.95        1.88       1/2305.    71.9%       1.00
    3      1       360      17.95       16.73         4500.
                   360       3.30        3.21       1/1363.    66.1%       1.34
上一篇:商业楼地下层空调通风系统设计+CAD图纸
下一篇:酒店空调系统设计+CAD图纸+文献综述

陶粒混凝土茬高层建筑现...

试论房屋建筑钢筋混凝土...

论建筑框架结构梁柱节点施工工艺【2330字】

浅谈房屋建筑钢筋混凝土...

浅谈建筑工程框架结构工...

桥梁施工中现浇盖梁支架...

建筑工程框架结构施工技术探讨【3051字】

浅谈传统人文精神茬大學...

《醉青春》导演作品阐述

国内外无刷直流电动机研究现状

拉力采集上位机软件开发任务书

多元化刑事简易程序构建探讨【9365字】

中国古代秘书擅权的发展和恶变

浅谈新形势下妇产科护理...

高校网球场馆运营管理初探【1805字】

谷度酒庄消费者回访调查问卷表

辩护律师的作证义务和保...