2      1       257      14.68       13.56         4500.
                   257       5.66        5.33       1/ 795.    19.8%       1.76
    1      1       142       9.04        8.24         5800.
                   142       9.04        8.24       1/ 642.    99.6%       1.54
 
   Y方向最大层间位移角:               1/ 642.(第  1层第 1塔)

  === 工况  6 === Y- 偶然偏心地震作用下的楼层最大位移

  Floor  Tower    Jmax     Max-(Y)     Ave-(Y)       h
                  JmaxD    Max-Dy      Ave-Dy    Max-Dy/h      DyR/Dy    Ratio_AY
    4      1       369      23.21       18.44         4500.
                   369       2.20        1.78       1/2050.    71.9%       1.00
    3      1       267      21.11       16.73         4500.
                   267       4.16        3.21       1/1081.    65.3%       1.28
    2      1       152      16.99       13.56         4500.
                   152       6.79        5.35       1/ 663.    19.2%       1.72
    1      1        37      10.22        8.22         5800.
                    37      10.22        8.22       1/ 568.    99.2%       1.52
 
   Y方向最大层间位移角:               1/ 568.(第  1层第 1塔)
上一篇:商业楼地下层空调通风系统设计+CAD图纸
下一篇:酒店空调系统设计+CAD图纸+文献综述

陶粒混凝土茬高层建筑现...

试论房屋建筑钢筋混凝土...

论建筑框架结构梁柱节点施工工艺【2330字】

浅谈房屋建筑钢筋混凝土...

浅谈建筑工程框架结构工...

桥梁施工中现浇盖梁支架...

建筑工程框架结构施工技术探讨【3051字】

浅谈传统人文精神茬大學...

《醉青春》导演作品阐述

国内外无刷直流电动机研究现状

拉力采集上位机软件开发任务书

多元化刑事简易程序构建探讨【9365字】

中国古代秘书擅权的发展和恶变

浅谈新形势下妇产科护理...

高校网球场馆运营管理初探【1805字】

谷度酒庄消费者回访调查问卷表

辩护律师的作证义务和保...