2  Engineering Profile
The project is the Huayi Hotel in Ningbo where is hot in summer and cold in winter  including catering, business, entertainment, accommodation. The building has 18 floors, and 1st~3rd floor has 3560 square meters area each , 5th~18th floor has 1167 square meters each.Total construction area is 28185 square meters. The first floor is 5.2 meters high, with shopping malls, lounge, lobby, information center, reception, church; the second floor is 4.5 meters tall, with Chinese food hall, rooms, cafe, galleries, restaurants, tea palace; the third floor is 4.5 meters tall, with large conference room, VIP lounge, lobby, small conference rooms, entertainment, fitness. The fifth to eighteenth floors are 3.6 meters high,with guest rooms.
3  Design Basis
[1]《Code for design of heating, ventilation and air conditioning (GJ19-87)
[2]《Code for fire protection design of high rise civil buildings 》(GB50045-1995)
[3]《Code for fire protection of building design 》(GB50016-2006)
[4]《Code for construction and acceptance of heating and sanitary engineering 》(GB243-82)
[5]《Code for construction and acceptance of ventilation and air conditioning engineering 》(GB50243-9)
[6]《Public building energy efficiency design standards 》(GB50189-2005)
4  Main Tasks of Design
The design is mainly based on the climate characteristics of Ningbo , and the design of summer cooling demand is preferred. Load calculation of air conditioning system in the area should be finished. According to the load of the room and the room function , combining with the building plan, comparingdifferent system plans, considering  the various aspects of economic construction, and finally the fan coil plus fresh air independent system is selected. Then we should select and arrange the terminal equipments. The next step is air conditioning system, water system design, including the wind pipe, pipe line arrangement, the choice of the form of wind, etc.. The hydraulic calculation of the air system and water system ,the design of ventilation and smoke control should be started. At last, draw the design drawing and write the design specification.
5  Air Conditioning Wind System
Through research of the drawings, the basic air conditioning wind system is as follows: the design is for the hotel, mainly used for accommodation, and the room area is small, so we can give full play to the characteristics of the fan coil unit. People can automatically control and adjust the room temperature in each room, which does not affect the use of other rooms, and can reduce the operation cost, so we choose the fan coil plus fresh air system. First to third floor  each set three fresh air units, pided into the left, middle and right partitions; fifth to eighteenth floors each set two fresh air units, pided into left and right partitions.
6  Air Conditioning Water System
The design of air conditioning water system of this project adopts two control, closed type, primary pump constant flow system, each layer of water pipe different course arrangement, the vertical tube with the process layout, the system is simple and the construction is convenient. In order to ensure the load change system can be effective, reliable and energy saving operation, set three sets of frozen water pump, one of which is a spare water pump. Chilled water welded steel pipe, condensation pipe using galvanized steel pipe, pipe insulation before the brush two rust primer.
 目  录
1 工程概况与设计依据    1
1.1 工程概况    1
1.2 设计参数    1
1.2.1 围护结构基本信息    1
1.2.2 围护结构做法    2
1.2.3 室外设计参数    4
1.2.4 室内设计参数    4
2 负荷计算    6
2.1 夏季负荷的计算    6
2.1.1 空调负荷计算方法    6
上一篇:办公楼中央空调及空气净化系统设计+图纸
下一篇:商业区域空调通风系统设计+CAD图纸

上海华漕镇社区图书馆建筑与结构设计

临港张江中心商务办公设计

主跨110m预应力混凝土连续刚构桥设计

杭州未来科技城1号地块BIM设计

某会议综合楼的消防设计

二级公路桐千线公路设计

Midas牛家沟大桥设计4*40m先...

拉力采集上位机软件开发任务书

高校网球场馆运营管理初探【1805字】

国内外无刷直流电动机研究现状

多元化刑事简易程序构建探讨【9365字】

浅谈传统人文精神茬大學...

谷度酒庄消费者回访调查问卷表

中国古代秘书擅权的发展和恶变

辩护律师的作证义务和保...

《醉青春》导演作品阐述

浅谈新形势下妇产科护理...