3.2 Statistics on Scheduling Problems and Performance Measures

3.2.1 Scheduling Problems

Table 3 shows the distribution of scheduling problems that are involved under this category. As for the general FMS schedul- ing studies, the parts dispatching was a popular item, which attracted the attention  of many  authors.

3.2.2 Performance Measures

Both flow-time and tardiness related measures were employed most frequently as  the  performance  measures.  This  is shown in  Table 4.

Table 3. Scheduling problem in multi-criteria scheduling    approaches.

Scheduling Number of Reference Period

problem publications number of

publications

Chryssolouris et al. [59] tested a modular system that  treated a production scheduling problem as a multi-criteria decision- making issue using a simulation model. The developed method attempted  to  model  the  decision-making  process,  at the work

  centre  level,  as  a  multi-criteria  decision  problem.  The simul-

Parts  dispatching  8 [59],  [83],  [85– 1985–1999

89], [91]

Machine  selection 1 [84] 1990

AGV  scheduling   3 [84],  [88],  [90]  1990–1996

Table 4. Performance measures used in multi-criteria    approaches.

ation model consisted of two different work centre configur- ations (i.e. one work centre, and five work centres) and com- pared the rule-based method with four dispatching rules, which were LCFS, FCFS, SPT, and LPT. The employed performance measures were average flow-time, WIP, number of jobs com- pleted, and mean tardiness. The results showed that  for one work centre, the SPT rule performed well, and in the case of

  five work centres, the rule outperformed all other dispatching

Performance Number of Reference Period measures publications number of

publications

Flow-time  related 5 [59],  [84],  [86], 1988–1996

[88], [90]

Tardiness or tardy  5 [59],  [84],  [86], 1988–1999

job related [87], [91]

Utilisation  related 3 [83],  [84],  [87]  1985–1994 (including system,

machine, station, etc.)

Cost related 2 [87], [91] 1994  and 1999

Inventory  related  1 [59] 1988

Others 4 [59],  [83],  [87], 1985–1996

[90]

3.3 Review of  Related Publications

Shanker and Tzen [83] found that random FMSs require bal- anced workloads to operate effectively. They studied a schedul- ing problem in an FMS that was considered to be a composite of two independent tasks: loading and sequencing. Formulations were  presented for  the  loading problem  with  two objectives:

上一篇:水辅助注塑系统英文文献和中文翻译
下一篇:连杆机构英文文献和中文翻译

开关电源水冷却系统英文文献和中文翻译

多极化港口系统的竞争力外文文献和中文翻译

机床控制系统英文文献和中文翻译

动力传动系统振动特征英文文献和中文翻译

旋转式伺服电机的柔性电...

电力系统智能波形记录仪英文文献和中文翻译

集成生理传感器系统英文文献和中文翻译

AES算法GPU协处理下分组加...

压疮高危人群的标准化中...

基于Joomla平台的计算机学院网站设计与开发

从政策角度谈黑龙江對俄...

酵母菌发酵生产天然香料...

上海居民的社会参与研究

浅论职工思想政治工作茬...

浅谈高校行政管理人员的...

STC89C52单片机NRF24L01的无线病房呼叫系统设计

提高教育质量,构建大學生...