Performance Measures

Table 2 summarises performance measures appearing in papers. Flowtime related measures have attracted the most attention, followed by tardiness related measures and utilisation related measures.

2.3 Review of  Related Publications

Nof et al. [44] studied the control problem in an FMS. Three rules were considered for part releasing into the empty system, and two rules for part releasing into the loaded system. Two performance measures were employed, which were system utilisation  and  production  rate.  Their  work  showed  that   the

Table 2. Performance  measures  used  in general  FMS scheduling  studies.

and RANDOM. Six performance measures, which are station utilisation, production rate and average throughput time  for each part type, simulation time, total number of parts produced, and total processing time, were used in this study. The effect of transporter speed and capacity on production rate and station utilisation were discussed. It was concluded that the SPT rule was the best rule, as it resulted in higher production, higher utilisation, shorter  throughput time,  and less  congestion  in the system. Neither due-date assignments nor due-date-based measures of performance were employed in the simulation model.

Bell and Bilalis [46] investigated a real FMS consisting of three machines using a digital simulation. Only one decision point was considered in the simulation model. They  explored the effect of three dispatching rules (SIO, LIO, and FIFO) on machine utilisation  and  throughput times.  Due-date-based rule

  and  related  measure  of  performance  were  not  considered  in

Performance Number of Reference  number Period measures publications of publications

Flow-time 36 [4],  [23], [25], 1979–2000

related [27],  [28], [32],

[36],  [44], [46–

48],  [50–56], [58–

63],  [66–69], [71],

[73–77]  [79], [80]

Tardiness or 19 [23],  [27], [28], 1983–2000

tardy  job related [36], [47–49],

[59],  [60], [62],

[70],  [71], [73–

75],  [77], [79–81]

Utilisation 17 [25],  [27], [32], 1979–1995

related [36],  [44], [46],

(including [49–52], [54–57],

system, machine, [60],  [73], [74] station, etc.)

Cost related 6 [23],  [47], [48], 1983–2000

[70],  [74], [81]

Inventory  related 6 [25],  [36], [54], 1981–1995

[59],  [60], [70]

Others 12 [25],  [32], [34], 1981–1995

[36],  [50], [51],

上一篇:水辅助注塑系统英文文献和中文翻译
下一篇:连杆机构英文文献和中文翻译

开关电源水冷却系统英文文献和中文翻译

多极化港口系统的竞争力外文文献和中文翻译

机床控制系统英文文献和中文翻译

动力传动系统振动特征英文文献和中文翻译

旋转式伺服电机的柔性电...

电力系统智能波形记录仪英文文献和中文翻译

集成生理传感器系统英文文献和中文翻译

AES算法GPU协处理下分组加...

压疮高危人群的标准化中...

基于Joomla平台的计算机学院网站设计与开发

从政策角度谈黑龙江對俄...

酵母菌发酵生产天然香料...

上海居民的社会参与研究

浅论职工思想政治工作茬...

浅谈高校行政管理人员的...

STC89C52单片机NRF24L01的无线病房呼叫系统设计

提高教育质量,构建大學生...