In the modern office building, through using the comfort air conditioning systems to ensure the office staff feel comfortable at work. People take more seriously on the indoor air temperature, air humidity, cleanliness and air quality issues. Due to the shortage of energy increasingly attracted our attention. There is an urgent need for the office to install energy-saving, healthy and comfortable air-conditioning system to meet the high demand of working environment.

As the use of the office building features: staff to concentrate at work and after work, very small part of staff to work overtime , which requires air-conditioning system of the building being able to meet the large cooling load. In addition , it should also be able to providing efficient cold , in order to protect people's health ,secondly, a personnel office is more stable place , so the indoor air temperature and humidity , cleanliness and fresh air volume,etc are greatly affected the health of office workers , only the office building getting a better working environment which will improve the efficiency of the staff . Therefore, people have been paying more attention on air environment.

2. Project Overview

The project is located in Shanghai, 5 floors beyond the ground, with a total height of 22.5m, which is a multi-story building; the first floor with storage room, police office, and maintenance workshop, etc. ; the second to forth floor has standard office; the fifth floor are equipment room, exhibition hall, and central control room.

3. Design basis

3.1Location

Shanghai Latitude: 31 ° 16 ', Longitude: 121 ° 29', elevation: 4m

3.2Meteorological parameters

1) Atmospheric pressure: Winter 102.51Kp, summer 100.53Kp.

2) Outdoor calculation (dry bulb) Temperature (℃):

Tabel1.1 Outdoor calculation ( dry bulb ) Temperature (℃)

Winter Summer

Heating air conditioning Avg. daily lowest Ventilation air conditioning Avg. daily air conditioning Daily difference Ventilation

-2 -4 -11.3 3 34.4 30.4 6.3 32

3)Interior design parameters:

Tabel1.2 Interior design parameters

Room Name Summer Winter Fresh air 

M^2 /h.P Noise

Temperature Relative Humidity Temperature Relative Humidity

Office 26 60% 18 45% 30 ≤55

Storage Room 26 60% 18 45% 30 ≤55

Exhibition 26 60% 18 45% 30 ≤55

Equipment

上一篇:金松小学教学楼建筑与结构设计+CAD图纸
下一篇:上海八层集邮大厦建筑与结构设计+CAD图纸

论述核算型會计向管理型...

论财务管理中會计审核的促进作用【2070字】

论财务會计茬现代企业管...

论财务与會计茬企业管理中的功能【1861字】

论行政事业单位财务會计...

论网络经济时代的财务會计管理【1853字】

论新高校會计制度對高校...

浅谈传统人文精神茬大學...

辩护律师的作证义务和保...

国内外无刷直流电动机研究现状

浅谈新形势下妇产科护理...

多元化刑事简易程序构建探讨【9365字】

拉力采集上位机软件开发任务书

《醉青春》导演作品阐述

谷度酒庄消费者回访调查问卷表

中国古代秘书擅权的发展和恶变

高校网球场馆运营管理初探【1805字】