FOREWORD The Unified Facilities Criteria (UFC) system is prescribed by MIL-STD 3007 and provides planning, design, construction, sustainment, restoration, and modernization criteria, and applies to the Military Departments, the Defense Agencies, and the DoD Field Activities in accordance with USD(AT&L) Memorandum dated 29 May 2002。 UFC will be used for all DoD projects and work for other customers where appropriate。  All construction outside of the United States is also governed by Status of forces Agreements (SOFA), Host Nation Funded Construction Agreements (HNFA), and in some instances, Bilateral Infrastructure Agreements (BIA。) Therefore, the acquisition team must ensure compliance with the more stringent of the UFC, the SOFA, the HNFA, and the BIA, as applicable。76166

UFC are living documents and will be periodically reviewed, updated, and made available to users as part of the Services’ responsibility for providing technical criteria for military construction。 Headquarters, U。S。 Army Corps of Engineers (HQUSACE), Naval Facilities Engineering Command (NAVFAC), and Air Force Civil Engineer Support Agency (AFCESA) are responsible for administration of the UFC system。 Defense agencies should contact the preparing service for document interpretation and improvements。 Technical content of UFC is the responsibility of the cognizant DoD working group。 Recommended changes with supporting rationale should be sent to the respective service proponent office by the following electronic form: Criteria Change Request (CCR)。 The form is also accessible from the Internet sites listed below。

UFC are effective upon issuance and are distributed only in electronic media from the following source:

Hard copies of UFC printed from electronic media should be checked against the current electronic version prior to use to ensure that they are current。

KATHLEEN I。 FERGUSON, P。E。The Deputy Civil Engineer DCS/Installations & Logistics Department of the Air Force

Dr。 GET W。 MOY, P。E。Director, Installations Requirements and ManagementOffice of the Deputy Under Secretary of Defense (Installations and Environment)

Contents

Page

CHAPTER 1 INTRODUCTION 

1-1 SCOPE 1-1

1-2 PURPOSE OF CRITERIA 1-1

1-3 SPECIFIC PROCESSES 1-1

CHAPTER 2 GENERAL REQUIREMENTS

2-1 GENERAL CRITERIA 2-1

2-2 COORDINATION 2-1

2-3 DESIGN PROCEDURE 2-1

2-3。1 Step 1 2-1

2-3。2 Step 2 2-2

2-3。3 Step 3 2-2

2-3。4 Step 4 2-2

2-3。5 Step 5 2-2

2-3。6 Step 6 2-2

2-3。7 Step 7 2-2

2-3。8 Step 8 2-2

2-4 DESIGN CRITERIA 2-2

2-4。1 Ductwork 2-2

2-4。2

上一篇:基于网络的注塑模具智能设计英文文献和中文翻译
下一篇:三维有限元分析英文文献和中文翻译

张家港某舾装码头工程设计+CAD图纸

阻尼减震平台的设计英文文献和中文翻译

兰州某大酒店空调设计+CAD图纸

新能源空调系统设计英文文献和中文翻译

机械设计制造及其自动化英文文献和中文翻译

FPGA的全景拼接相机的优化...

海水淡化的优化设计英文文献和中文翻译

小学《道德与法治》学习心得体会

浅谈动画短片《天降好运》中的剧本创作

大学生就业方向与专业关系的研究

林业机械作业中的安全性问题【2230字】

人事管理系统开题报告

适合宝妈开的实体店,适...

淮安市老漂族心理与休闲体育现状的研究

组态王文献综述

弹道修正弹实测弹道气象数据使用方法研究

紫陵阁