5-4。1 Exhaust Air System。  Provide an exhaust system that captures contaminated air generated during FRP fabrication and repair operations。 Refer to Chapter 2 of this UFC; UFC 3-600-01; NFPA 33, Standard Spray Application Using Flammable and Combustible Materials; NFPA 68, Guide for Venting Deflagrations; NFPA 91,Standard for Exhaust Systems for Air Conveying of Materials; NFPA 654, and the specific requirements of this Chapter。

5-4。2 Hood Design。  The sizes and shapes of work pieces in FRP fabrication and repair facilities vary。 Design separate hoods for processes producing only particulate and only vapor, and both particulate and vapor。 Consider a molding system that completely encloses the work piece if the facility repeatedly manufactures the same work piece。 Design exhaust hoods to enclose all processes to the greatest possible extent without inhibiting operations。 Baffle all exhaust hoods to reduce cross drafts and improve hood efficiency。 Table 5-1 summarizes recommended exhaust hoods, capture velocities, and air pollution control devices for each operation。

Table 5-1。  Recommended Hood, Capture Velocity, and Air Pollution Device

Operation (expected contaminant)

Hood Type Recommended Capture Velocity (m/s (fpm)) Air Cleaning Device

(see notes)

Chemical Mixing (vapors) Workbench (Figure 5-2) 0。51 m/s (100) 1

Lay up (Vapors) Workbench/Floor Exhaust (Figure 5-3) 0。51 m/s (100) 1

Spray up (Vapors) Spray up Booth (Figure 5-4) 0。51 m/s (100) 1

Grind,Cut,Saw (Particulate) Workbench/Floor Exhaust (Figure 5-3) 0。76 m/s (150) 2

Cleanup (Vapors) Ventilated Sink (Figure 5-5) 0。51 m/s (100) 3 or 1

Hand Tools (Particulate) LVHV Vacuum System Not applicable 2

NOTES: (1) Determined by the local air pollution regulatory agency,

(2) fabric collector, and

(3) substitute an aqueous emulsion cleaner for acetone。

5-4。2。1 Plenum Velocity。  Design the plenum velocity at least one-half, but no greater than, the velocity through the perforated plate or layered prefilter to create an even airflow over the hood face。 Design the hood-to-duct transition with an included angle of no more than 90 degrees。

5-4。2。2 Hood Length。  Specify that the length of the hood served by each exhaust plenum will not exceed 2。44 m (8 ft)。 For example, hoods between 2。44 and

4。88 m (8 and 16 ft) in length will have two exhaust takeoffs。 Provide cleanout doors in the plenum to allow removal of accumulated particulate。

5-4。2。3 Portable Hand Tools。  Use portable hand tools with LVHV vacuum systems for sawing, cutting, and grinding on all work pieces。 Ensure that the tools, with their vacuum hoses, are properly sized for the work piece internal angles and curvature。 LVHV systems are described in paragraph 5-4。7。

上一篇:基于网络的注塑模具智能设计英文文献和中文翻译
下一篇:三维有限元分析英文文献和中文翻译

张家港某舾装码头工程设计+CAD图纸

阻尼减震平台的设计英文文献和中文翻译

兰州某大酒店空调设计+CAD图纸

新能源空调系统设计英文文献和中文翻译

机械设计制造及其自动化英文文献和中文翻译

FPGA的全景拼接相机的优化...

海水淡化的优化设计英文文献和中文翻译

STC89C52单片机NRF24L01的无线病房呼叫系统设计

浅谈高校行政管理人员的...

上海居民的社会参与研究

基于Joomla平台的计算机学院网站设计与开发

AES算法GPU协处理下分组加...

从政策角度谈黑龙江對俄...

浅论职工思想政治工作茬...

压疮高危人群的标准化中...

提高教育质量,构建大學生...

酵母菌发酵生产天然香料...