1-3 SPECIFIC PROCESSES。 The specific processes addressed in this handbook are asbestos delagging, torpedo refurbishing (Otto Fuel II), fiberglass reinforced plastic fabrication and repair, abrasive blasting, woodworking, battery maintenance, paint spray booths, and aircraft corrosion control hangers。

GENERAL REQUIREMENTS

2-1 GENERAL CRITERIA。 Installing engineering controls is the preferred method of controlling hazardous processes as specified in 29 CFR 1910。1000(e), Air Contaminants and OPNAVINST 5100。23, Navy Occupational Safety and Health Program Manual。 Properly designed industrial ventilation systems are the most common form of engineering controls。

2-2 COORDINATION。 Form a project design team to direct the design of industrial ventilation projects。  Include in the design team representatives from:

Effected industrial shop。

Public works。

Health and safety office。

Cognizant Regional Engineering Office (REO) (for example: Navy Engineering Field Division, Army Corps of Engineers Division, and Air Force major command engineering office)。 The REO representative establishes a design team and acts as the team leader in all cases, except when the cognizant REO grants a variance。

Industrial hygiene and safety offices。

NOTE U。S。 NAVY: BUMED or activity IH。 Use Naval Environmental Health Center as a back-up。

System command program manager (where applicable)。

System safety engineer。

Environmental manager。

2-3 DESIGN PROCEDURE。 Refer to the ACGIH IV Manual, Industrial Ventilation; A Manual of Recommended Practice, Chapter 5, "Exhaust System Design Procedure," for system design calculations。 Design all industrial ventilation systems in accordance with paragraphs 2-3。1 through 2-3。8。

2-3。1 Step 1。  Identify all significant contaminant sources that require ventilation control。 Request the local industrial hygiene office to provide a source characterization with area diagrams of the contaminant sources, and employee work areas。 Also,

consider how the system being designed might affect the performance of any existing processes, industrial ventilation systems or HVAC systems。

2-3。2 Step 2。  Consider how the facility is to be used or expanded in the future。 It may be possible to initially specify fans that are capable of handling future needs at minimal increased cost。

2-3。3 Step 3。  Select or design the exhaust hood that best suits the work piece or operation。 Design the exhaust hood to enclose the work piece or operation as much as possible。 This will reduce the ventilation rates required to provide contaminant control。 This UFC provides optimum exhaust hood designs for many of the operations covered。

2-3。4 Step 4。  Determine the capture velocity required to control generated contaminants。 Capture velocities in this UFC are specified assuming there are no cross drafts or turbulence that adversely affects the capture efficiency。 Reduce potential for cross drafts or turbulence near a given exhaust hood by properly locating and designing the hood with baffles, and also by designing the replacement air system to complement the exhaust system。

上一篇:基于网络的注塑模具智能设计英文文献和中文翻译
下一篇:三维有限元分析英文文献和中文翻译

张家港某舾装码头工程设计+CAD图纸

阻尼减震平台的设计英文文献和中文翻译

兰州某大酒店空调设计+CAD图纸

新能源空调系统设计英文文献和中文翻译

机械设计制造及其自动化英文文献和中文翻译

FPGA的全景拼接相机的优化...

海水淡化的优化设计英文文献和中文翻译

小学《道德与法治》学习心得体会

浅谈动画短片《天降好运》中的剧本创作

大学生就业方向与专业关系的研究

林业机械作业中的安全性问题【2230字】

人事管理系统开题报告

适合宝妈开的实体店,适...

淮安市老漂族心理与休闲体育现状的研究

组态王文献综述

弹道修正弹实测弹道气象数据使用方法研究

紫陵阁