Research on schedule management of construction project
Abstract: In the work of our country's socialist construction requirements, China's construction industry has also been a great development space. And because the population explosion, the rigid demand of people in the building industry is more and more big, but also to the development of construction enterprises has brought unprecedented pressure. Construction project general large investment, long cycle, in order to ensure the smooth implementation of construction projects, schedule control need comprehensive, objective, effective and forward-looking. This would be very important that the construction enterprises should contorl the work progress, schedule management work is an important work through the whole process of project management, the work of the construction has a great influence. This paper will analyze the construction schedule management in project management:
First of all, on the construction project management is briefly outlined, about progress management method, analysis of the factors influencing the schedule management, environment, human resources, construction method. Put forward a series of measures, including measures to ensure the construction technology, construction organization, construction measures to guarantee the material guarantee measures, construction equipment management and assurance measures, construction labor assurance measures.
Then, according to the basis schedule plan and development tool, from the application angle, can be operable, on how to prepare a construction project construction schedule were discussed, including the work breakdown structure, network planning chart, time parameter calculation, the key line determination etc.. At the same time, and proposed the solutions to the possible bias.
Finally, by using the method of the above mentioned, combined with Tiancheng Building construction projects, the construction schedule and control procedures is a rising process, discusses emphatically the implementation should pay attention on the schedule problems, adjust the treatment, in order to achieve the project goals.